{
  "version": "2.0",
  "updated": "2026-07-29T00:00:00Z",
  "capabilities": "basic",
  "provider": "Illustrative mapping prepared by the gateway operator, Andrei Besleaga, from the reporting subject's own published EMAS-validated Umwelterklaerung 2025 (environmental statement), validated by EMAS environmental verifier DE-V-0404; NOT published, reviewed, authorized, or endorsed by the reporting subject. Every figure is read from the source document named in methodology-uri. Scope caveats: German sites only (Gunzenhausen, Falkenstein, Nuernberg). carbon-footprint is the COMBINED Scope 1 + Scope 2 market-based figure; no split is published, so scope-1, scope-2 and scope-3 are all omitted. Scope 3 is not yet reported (planned end of 2027). energy-consumption is datacentre electricity only; company-wide consumption adds about 1.8 GWh of conventional supply, giving a company-wide renewable share above 99.5%.",
  "measurement-method": "hardware-estimated",
  "methodology-uri": "https://cdn.hetzner.com/assets/Uploads/downloads/Umwelterklaerung.pdf",
  "reporting-period": "2024",
  "target": "Hetzner Online GmbH",
  "energy-consumption": 235,
  "energy-unit": "GWh",
  "carbon-footprint": 272.5,
  "carbon-unit": "mtCO2e",
  "carbon-accounting": "market-based",
  "renewable-energy": 100,
  "disclosure-uri": "https://www.hetzner.com/unternehmen/nachhaltigkeit/",
  "target-type": "organization"
}